Buyer ToolsFrom order to your warehouse
Estimate My TimelineHow long until your furniture arrives? Pick your order size, destination and start date. The estimator adds up drawing approval, production in our Sonipat factory, packing, the trip to the Indian port, the sea voyage and customs at your end, and gives you a date range. Add the date you need it by and it tells you whether you are on time.
Lead time depends on order size: the bigger the order, the longer it takes. Most orders are ready for dispatch within 3 to 5 weeks of drawing approval. Large bulk orders take longer, and a 100-room hotel typically takes 8 to 12 weeks. Custom sizes and new designs add time for drawings and a sample.
We confirm the exact timeline with each quote, before you commit.
| Destination | Typical transit |
|---|---|
| USA — East Coast (New York / Savannah) | 28–40 days |
| USA — West Coast (Los Angeles / Long Beach) | 28–35 days |
| Canada — Vancouver | 30–40 days |
| Canada — Halifax / Montreal | 28–45 days |
| United Kingdom (Felixstowe / London Gateway / Southampton) | 20–30 days |
| Australia (Sydney / Melbourne / Brisbane) | 19–28 days |
| New Zealand (Auckland / Lyttelton) | 36–45 days |
From Mundra or Nhava Sheva. Many US East Coast and UK sailings now route around the Cape of Good Hope instead of Suez, which adds 10 to 15 days; the ranges allow for this.
Plan on about 2 to 4 months door to door. Most orders are ready for dispatch 3 to 5 weeks after drawing approval, then the sea voyage takes roughly 3 to 6 weeks depending on the destination, plus time at the ports. Large projects such as a 100-room hotel take 8 to 12 weeks to produce.
About 28 to 35 days port to port to Los Angeles, and 28 to 40 days to New York, since many East Coast sailings now go around the Cape of Good Hope.
About 20 to 30 days port to port to Felixstowe, London Gateway or Southampton.
About 19 to 28 days port to port to Sydney, Melbourne or Brisbane.
Start procurement at least 6 months before opening. Allow time for design approval and samples, 8 to 12 weeks of production for a full hotel, 4 to 6 weeks of freight, and installation before soft opening.
Tell us what you need and when. We check the production schedule and current sailings and reply within 48 hours.